West River Trail Workday Report

 

WRT trail workday June 2017Huge thanks to the 5 volunteers who showed up to help repair the West River Trail.
Below is Jason Cooper’s report from the Trail Work Day.

We got an incredible amount done today!
Repaired erosion on the steeps of the I-91 bridge bypass.
Trimmed back brush and grass on the bypass.
Cleaned out and repaired many culverts from I-91 (mile 2) to just before mile 3.8.
Removed many downed trees.
Filled many holes in the trail.

The biggest surprise was the incredible washout on the Fox Farm Road access. It is as bad as it was after Hurricane Irene. This will take some structural redesign. There is also still some work to do between mile 3.8 and the foot bridge at mile 4.1, and a ditch at mile 2.8. Beyond the foot bridge there are several erosion cuts in the trail bed that will need fill trucked in.
WRT trail workday June 2017 - 2
Photos are on the Fox Farm Road trail access. Photos by Jason Cooper. The trail really needs your help! If you use the trail regularly, please consider lending a hand on the next workday or making a contribution to help maintain the trail. Email us at lowersection@gmail.com with any questions.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s